US$ 100.75
and enclosure location during system design
Zone-to-zone delay
The 200B platform is designed for approximately 5 to 120 GPM
Higher flow or colder inlet water will reduce the available temperature rise
50 ft of 1/4 in
Prier - 630-0043 - Kit - Service - Mansfield BD - Sillcock & Stop and Waste Valves 47 x 24 and enclosure location during systemKit Service Mansfield BD Sillcock & Stop and Waste Valves