US$ 112.50
Volume 1 covers action just north of White Haven through the Wyoming Valley
In the early 1970’s Amtrak needed new motive power to replace the rapidly aging locomotive fleet that they inherited
Includes step-by-step instructions so even LEGO® beginners can build confidently
Light Weight
The slotted shank keys into the light weight drilled T-handle and is secured by 4 steel screws
Athearn Genesis G1240 HO Scale EMD GP7 Precision National PNC 1508 DC Bridge - Trestle Volume 1 covers action justAthearn Genesis G1240 HO Scale EMD GP7 Precision National PNC 1508 DC In 1949, EMD introduced the GP7. The basic design followed most diesel switchers with the addition of a short hood instead of an end cab. The hoods were also full height to better accommodate the diesel engine and mechanical and electrical components. Many railroads chose to rebuild their GP7s and GP9s for continued service. Often times, it was cheaper to do this rather than
US$ 112.50
US$ 161.50
US$ 165.00
US$ 245.00
US$ 755.00
US$ 160.00
US$ 142.50
US$ 275.00
US$ 136.00
US$ 237.00
US$ 197.50
US$ 48.00
US$ 825.00
US$ 137.50
US$ 92.00
US$ 165.00
US$ 160.00